Por favor, use este identificador para citar o enlazar este ítem: https://repositorio.pascualbravo.edu.co/handle/pascualbravo/561
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.rights.licenseAl consultar y hacer uso de este recurso, está aceptando las condiciones de uso establecidas por los autores.spa
dc.contributor.advisorVillegas López, Carlos Enrique-
dc.contributor.authorErazo Hincapié, Juan Diego-
dc.contributor.authorCaro Gómez, Juan Fernando-
dc.coverage.spatialMedellín, Colombiaspa
dc.coverage.spatialhttps://www.google.com/maps/place/INSTITUCION+UNIVERSITARIA+PASCUAL+BRAVO/@6.2731943,-75.5866332,19z/data=!4m5!3m4!1s0x8e44293b5709163d:0x2744a3a12c601259!8m2!3d6.2731944!4d-75.5866335spa
dc.date.accessioned2021-03-19T22:21:03Z-
dc.date.available2021-03-19T22:21:03Z-
dc.date.issued2015-
dc.identifier.urihttps://repositorio.pascualbravo.edu.co/handle/pascualbravo/561-
dc.description.abstractResumen: Durante el desarrollo de los objetivos que se plantearon en este trabajo, se detectó que el proceso en la línea de empaque de Griffith Colombia, tiene algunas falencias que vienen tanto en el suministro de la materia prima, como en el proceso de empaque, aquí se ven involucradas algunas variables, tales como el tiempo y el desperdicio de material de empaque. Algunas de las principales causas son los paros por daños mecánicos, donde nace una gran oportunidad de mejora para el área de mantenimiento; adicional a esto las máquinas ya presentan un desgaste debido a que ya cumplieron su ciclo de vida; otras de las causas es la falta de abasto de materia prima a la máquina, ya que los montacarguistas están realizando otras labores descuidando el proceso, y esto lleva a que se genere paros innecesarios. Se logró calcular el número de observaciones que se deben realizar para que el proceso pueda llevarse a cabo en condiciones normales y que cumpla con un nivel de confianza del 95%, con los cálculos previos dio como resultado un tiempo estándar de 5,67 minutos para todo el proceso. Por último con el diagrama de desperdicios se detecta que se tiene un desperdicio total de 8,5 kg de laminado durante todo el proceso, que es muy significativo si se tiene en cuenta el costeo del producto, y las condiciones del proceso, aquí es necesario ajustar el proceso del ensayo de sobres con agua y la desalineación de la cuchilla principal, etapa donde hay más desperdicio de producto terminado. (Vollman, Berry, & Whybark, 1997)es_ES
dc.description.abstractAbstract: During the development of the objectives raised in this study, it was found that the process in the packing line of Griffith Colombia has some shortcomings like the supply of raw materials as well as the packaging process; some variables are involved, such as time and waste of packing material. Some of the main causes are the strikes by mechanical damage, which imply a big opportunity for improvement in the maintenance area, additional to this; the machinery show up tear and wear due to the machines completed their life cycle. Other causes; poor supply of raw materials for the machine, forklift operators performing other activities instead of follow the process, entailing unnecessary shutdowns and possible strikes. It was calculate the number of observations that must be made to carry out the process under normal conditions in compliance with a confidence level of 95%. Previous calculations resulted in a standard time of 5.67 minutes to complete the entire process. Finally, the diagram and analysis of waste handle show us a 8.5 Kg total waste of laminate throughout the process, which is very significant taking account the product cost and the process conditions. Therefore, will be necessary adjust the test process using water and correcting the misalignment of the main blade, stage where is highly noticed the waste of finished product.es_ES
dc.format.mimetypeapplication/pdfen
dc.language.isospaspa
dc.publisherInstitución Universitaria Pascual Bravospa
dc.publisherInstitución Universitaria pascual Bravo - IUPBspa
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/spa
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/spa
dc.sourceinstname: Institución Universitaria Pascual Bravospa
dc.sourcereponame: Repositorio Institución Universitaria Pascual Bravospa
dc.subjectEstudio de tiemposes_ES
dc.subjectMantenimiento de equiposes_ES
dc.subjectEstudio de métodos y tiemposes_ES
dc.subjectEmpaqueses_ES
dc.subjectDiseño mecánicoes_ES
dc.titlePropuesta para la estandarización del proceso en la línea de empaque de Griffith Colombia S.A.S.es_ES
dc.typeinfo:eu-repo/semantics/bachelorThesisen
dc.rights.accessrightsopenAccessen
dc.rights.accessrightshttp://purl.org/coar/access_right/c_abf2en
dc.creator.degreeIngeniero Industrialspa
dc.type.hasversioninfo:eu-repo/semantics/publishedVersionen
dc.type.hasversionhttp://purl.org/coar/version/c_ab4af688f83e57aaen
dc.publisher.facultyInstitución Universitaria pascual Bravo, Facultad de Producción y Diseñospa
dc.publisher.programIngeniería Industrialspa
dc.type.contentTexten
dc.thesis.degreePregradospa
dc.type.coarhttp://purl.org/coar/resource_type/c_7a1fen
dc.type.redcolhttps://purl.org/redcol/resource_type/TPen
dc.type.localTesis/Trabajo de grado - Monografía - Pregradospa
Aparece en las colecciones: Ingeniería Industrial

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Rep_IUPB_Ing_Ind_Griffith.pdf1,04 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está protegido por copyright original



Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons